Building Scotland Act 2003

Tuesday, 21 August 2018
Reference
2017070327000114
Category
Request Date
Monday, July 3, 2017
Response Date
Monday, July 17, 2017

Question

We would like to (and hereby do) make an Information Request that we be provided with all information collected by you pursuant to your statutory duty under the Building (Scotland) Act 2003 and subsequently contained within all Notices/Orders that have been :

(1) served,

(2) remain extant,

(3) Complied with, and

(4) Complied with but have invoices pending in respect of works carried out by or on behalf of your council,

 

during the period 19th Jan 2017 to the 3rd July 2017, under or pursuant to Sections 25, 26, 27, 28, 29 and 30  of the Building (Scotland) Act 2003 which information would form part of any PEC issued by the Council were one to be issued. Please answer all four questions.

Answer

Dangerous Building Cases (January – July 2017) – Status as at 17 July 2017

 

  1. Extant Notices   7A Tolstachaolais, Isle of Lewis Date Notice Served 13/6/13 (section 30) Work Requirements / Provisions to be Met Take down existing southmost gable elevation to wallhead level. Downtakings to be carefully placed within building walls. Take down existing internal gable wall. Downtakings to be carefully placed within the building walls. Take down section of unstable west elevation wall opposite 7A Tolstachaolais. Downtakings to be carefully placed within the building walls. Take down front elevation cast iron gutters and lay aside within the walls of the building. Take down sections of cast iron rainwater downpipes and lay aside within the walls of the building. Take down existing cast iron rooflight on front elevation roof pitch and lay aside within the walls of the building. Sheet over rooflight opening with suitable material. Board up and secure ground floor openings (excluding front elevation porch openings) using timber framing and OSB sheeting. Strip all asbestos cement slates on all roof pitches and sheet over openings on roof with suitable sheet material.   2. Notices Served within period - NIL 16 Holm Road, Isle of Lewis

Date Notice Served 30/6/17 (section 30)

 

Work Requirements / Provisions to be Met

Board up or secure all openings to prevent access to the building.

Board up hole in rear extension flat roof to prevent access to the building.

Remove or secure the timber sarking boards located on the scaffolding.

 

  1. Notices complied with within period - NIL
  2. Complied with but invoices pending or monies owed -  NIL